Product knowledge

What is the concrete difference between rubber dam and steel bar brake?

Date:2016-09-05 Num:998

Urban water conservancy buildings according to the current social construction of the actual situation of high demand for water sites for security and reliability, my unit in the domestic and international the usage and the effect of rubber dam and dam brake use situation and the effect on a large scale research, compare the following conclusions:

A, the service life
The design of the steel bar brake service life can reach 50 ~ 60 years, the longest life expectancy of brake on current international for nearly a century.For 1958 years to build the first domestic fujian stream power station still in use, before liberation began to use the same steel structure has been used so far are everywhere.The authorities initially determined according to indoor test and engineering practice the service life of rubber dam 10 ~ 15 years a dam bags must be replaced.So far the domestic first not more than 15 years, the life of a rubber dam was built in last century, our country northeast many rubber dam has been dismantled and power station was built in 2005, is located in the east of guangxi bamboo shoots of the rubber dam has dismantled the redevelopment of the steel gate.A steel bar brake investment equals four rubber dam (among a large number of construction of auxiliary work doesn't count).
Second, the damage and repair
(1) the destruction caused by human damage
Rubber dam is vulnerable to sharp and pointed object is damaged, to easily suffered due to ignorance or malicious damage caused by the severe repeated injury should not be installed where the rubber dam.
2) after the flood debris damage, the influence of the landscape

Because all sorts of debris left over after the flood, such as civilian infrastructure and building materials of this kind of sharp objects is likely to damage of the upstream of dam surface.Small leakage is easy to repair, however, if the leakage has a very large area, such as the structure of the leakage caused by gravel, it is difficult to fix up.All sorts of debris and legacy in bashang brings great impact to the landscape, the operation unit to send wash after each dam collapse, larger workload.
(3) the deflated water damage
Deflated during water, rubber dam could be as close to the dam downstream the punctured by sharp objects.
(4) the wear damage
The vibration of the dam, dam and river plate and on both sides of the friction, and floating debris could cause dam friction losses.
(5) the fire damage
1, fire may be adverse to the rubber dam is the most potential hazard factor.Fire can cause a wide range of dam damage, the repair of large dam is sometimes not possible.Is important for the dam, the feasible way is to provide the spare rubber dam, so that in the event of a severe damage, can quickly replaced.
2, gate itself rigidity properties determine the above situation will not happen.Here we gate rigidity for the detailed analysis, the use of special composite materials for moving parts of the gate now mga.to, MGB, this kind of material in the underwater operation years do not need to add lubricant, also will not rust.
3, recent data report shandong linyi city yugoslav capital project small port east block river running five or six years, rubber dam dam body has been repaired three times, fees as high as 6 million yuan (other), and gate rigidity for about thirty years or so a corrosion protection.
Three, operation
1, the running time of rubber dam is by air or water to reach the purpose of litres of dam filling, normally need 2 ~ 3 hours to rise or dam collapse completely, for a long time.And rigid gate hoist crane, running speed can reach 1 ~ 2 m/min, calculated the project I'm no more than 2 minutes to complete opened and shut the gate.This can effectively ensure the sudden flooding can discharge in a timely manner.Rubber dam will be increased with the increase of usage and year using gas (water), exhaust (water) time growth, because inside the dam and the pipe scaling.
2, operation reliability
(1) because the rubber dam leakage, the reason is that the rubber membrane crosslinked, stabbing, defect pipe connection and fastening systems and construction quality, therefore, to keep regular inflatable, can appear otherwise frustrated after a while dam (water) automatic falling phenomenon, sometimes dry river water all don't know, cause a certain loss, and steel bar brake USES mechanical lock, when the gate is closed or opened when regulating water level often Angle can lock, does not move.
3, vibration,
Rubber dam design specification specified in the overflow cannot exceed 50 cm, otherwise the event will appear across the dam, dam and steel brake can effectively overcome the defects, can form long time big flow of crest overflow from the waterfall effect.
Fourth, safety and reliability analysis
Rubber dam is generally needed to build a gas station or water pump room, line is much and complicated, and form a complete set of steel bar gate only two sets of integration type hoist, this type of opening and closing machine is a new type of opening and closing machine type, it has simple structure, easy to operate, without ancillary facilities such as tubing and pumping stations, the other of the opening and closing machine is equipped with manual devices, due to power failure or other fault can be manual operation manual operation, operating force just 5 kg.I can collapse when can effectively guarantee the dam collapse dam, dam dam can when, security is extremely high.
Rubber dam is generally difficult to achieve focus network control, and the steel gate (dam) can realize advanced automation control, network control in any global Internet can be controlled.
Five, the winter freeze
Rubber dam according to the design specification and the actual usage, once the winter ice must be to do a good job of shaved ice, or it will cause fatal damage about the quality of the rubber dam, and shaved ice working completely rely on artificial to complete, both time-consuming and expensive, and inconvenient to manage.To the spring thaw, the ice can't on rubber dam overflow, sharp and strong ice is likely to cut the rubber dam.Steel bar brake can be relaxed and safe winter, general steel bar brake tens of centimeters higher than saving water, so in winter, the steel bar brake tilt Angle, then if ice, ice can extends along the oblique upward, effectively release the expansion of the hydrolysis of ice force, the steel bar brake is not subject to any damage, the equivalent of normal breast wall of the river.The other due to the very nature of hard steel, all can be completely in the dam crest spillway of melting ice flood every spring.

Six, antisepsis problem

Steel bar brake surface is in accordance with the water resources and hydropower steel gate manufacturing standards for thermal spray zinc, strong adhesion, authority research results show that the velocity of 8 m/s or less, will pose no damage to the zinc layer, and the reported average river flow is unlikely to be the speed.

Seven, sedimentation problems

Steel bar brake is a special form of sluice structure, it has no slot bottom gate slot and a side door, door leaf is placed around the axis of the bottom structure.Upstream water pressure on the circular shaft, when the door is up or down, stop the water from the surface of the circular shaft, keep sealing water stop state;Lateral water stop the same principle, check the water has not left side breast wall up (stainless steel), so the silt dam (mud) does not affect the steel gate opening and closing.

In areas with severe siltation, generally set in front of the brake block sand (mud) sill and trumpet.One is to effectively block large stones, the second is when the collapse dam flood discharge, improve the flow rate of the gate location, sediment, water mixture can be effective to directly with water to the downstream.

North general reservoir is the main function of the brake.Vertical bar for a long time easy sedimentation, but steel is around the bottom of the axial downstream dam gate has fallen, so the dam collapse deposition of sediment was rushed to the downstream flow and blocked can't be formed.The other, after the flood we will according to the sediment content analysis of a local how a small amount of silt (mud), and through the silt (mud) to calculate the amount of opening and closing force needed for the door, fully consider the rev door to overcome the power of silt (mud).
Eight, the comparison of energy consumption

100 m rubber dam, the least amount of electricity load power 100 kw/hour or so, for the first time l dam time is about 2-3 hours.

100 m steel bar of the gate opening and closing only need 4 sets of hydraulic hoist, each maximum power rating of the hydraulic hoist is 15 kw.This 100 m steel bar brake electricity load power only 60 kw/hour or so.Every litres of dam is about 2 to 3 minutes.

Steel than rubber dam dam gate saves considerable power consumption every year.